JINSA

Strategic Pipeline — Entry 02 · Aviation Infrastructure
Jakarta International Nearshore Airport
Indonesia’s Gateway to the Future

JINSA is proposed as an engineered aviation island ±1.2 kilometers off the Marunda coastline, North Jakarta — a strategic, measurable solution to the structural capacity pressure facing Soekarno-Hatta International Airport (CGK) and to Jakarta’s long-term competitiveness as ASEAN’s premier aviation hub.

Location
±1.2km off Marunda, North Jakarta
Ultimate Capacity
70–80 million pax / year
Total CAPEX
USD 9.5 billion
Structure
PPP (KPBU), 100% investor equity
Jakarta International Nearshore Airport — aerial view of main terminal and access causeway
Development Concept
Nearshore reclaimed island
Total Area (Phase 1 & 2)
1,000 hectares
Runway Configuration
2 x Code F (3,500m x 60m)
Cargo Capacity
500,000+ tons / year
Causeway Length
±1,050 meters
Construction Start
2027 (pre-construction)
Funding Scheme
PPP (KPBU) with 100% investor equity
Project Overview

The Strategic Urgency Behind JINSA

Jakarta serves as the economic heart of Indonesia, with a metropolitan population exceeding 34 million people across the Greater Jakarta (Jabodetabek) region. Soekarno-Hatta International Airport (CGK), designed to serve 60 million passengers annually, has been operating far beyond its installed capacity — with a historical peak of over 80 million passengers prior to the pandemic and more than 54 million passengers currently served each year.

The absence of physical expansion space at CGK, coupled with aggressive capacity growth from regional hubs such as Singapore Changi, Kuala Lumpur International Airport, and Bangkok Suvarnabhumi, places Jakarta in a vulnerable position of potentially losing its status as the premier aviation hub in the ASEAN region. The cost of inaction is not merely operational congestion, but a loss of economic competitiveness and a threat to the Indonesia Emas 2045 vision.

JINSA is proposed as a strategic and measurable response: an engineered aviation island complying with ICAO Annex 14 Code F standards, integrating world-class airport infrastructure with logistics zones, commercial areas, and environmental sustainability into a single cohesive ecosystem — in regulatory alignment with DKI Jakarta RTRW 2024–2040 and Governor Regulation No. 21/2010.

This page summarizes the JINSA Business Proposal and Feasibility Study (PT Infinity International Corpora, 01 July 2026), based on public datasets from BMKG, AirNav Indonesia, BPS DKI Jakarta, Angkasa Pura II, IATA, ICAO, and NACO. Figures are indicative and subject to further due diligence.
Development and Construction Phases

A Phased Path to 70–80 Million Passengers

JINSA’s development is staged to ensure execution certainty and investment efficiency, from pre-construction through to ultimate capacity.

01
2027–2029 · 3 years
Pre-construction: GIP, AMDAL, permitting, PPP finalization, financial close
02
2030–2033 · 4 years
Phase 1 construction: reclamation, runway, terminal, causeway
03
Q3 2034
Phase 1 COD: capacity of 15–20 million passengers per year
04
2036–2039 · 4 years
Phase 2 construction: second runway and facility expansion
05
2040
Phase 2 COD: capacity of 40–50 million passengers per year
06
2055+ · Ongoing
Ultimate development: capacity of 70–80 million passengers, third runway option
Financial Overview

Total Funds Required: USD 9.5 Billion

Structured under the PPP (KPBU) scheme pursuant to Presidential Regulation No. 38 of 2015, with 100% investor equity financing.

ItemAmount (USD Billion)
Phase 1 investment5.5
Phase 2 investment4.0
Total Investment9.5
Passenger Spending Impact
SegmentAnnual Passengers (M)Avg. Spend (USD)Annual Impact (USD B)
International14.05007.00
Domestic12.11551.88
Transit4.0300.12
Total30.19.00
Annual Tax Contribution to DKI Jakarta Local Revenue (PAD)
Tax TypeValue (IDR Trillion / Year)
Passenger service charge2.0–3.0
VAT on airport services1.5–2.5
Employee income tax1.0–1.5
Tourism-related income tax1.5–2.0
Hotel and restaurant taxes0.5–1.0
Other local retributions0.5–1.0
Total7.0–10.0
Employment Generation
Employment TypePhase 1 (2034)Phase 2 (2040)Ultimate (2050+)
Direct8,000–13,00017,000–27,00029,000–40,000
Indirect and induced12,000–20,00023,000–54,00038,000–80,000
Total20,000–33,00040,000–81,00067,000–120,000
Economic Multiplier
USD 90B
10-year cumulative economic impact
±9.5x
Economic multiplier (10-year)
15–20x
Economic multiplier (project life cycle)
Alignment with National Priorities

Indonesia’s Gateway to the Future

National PriorityRole of JINSA
Indonesia Emas 2045 VisionConnectivity foundation for sustainable growth
DKI Jakarta RTRW 2024–2040Regulatory compliance and spatial alignment
National resilienceDual-airport system for redundancy and crisis mitigation
ASEAN competitivenessRestoring Jakarta’s position as a premier aviation hub
Regional economic developmentContribution to local revenue, employment, and investment
Invitation to Partner

JINSA is a national infrastructure asset, ready for execution under the PPP (KPBU) scheme pursuant to Presidential Regulation No. 38 of 2015. We invite:

Global investment funds and sovereign wealth funds
Development finance institutions and commercial banks
Institutional infrastructure investors
Strategic partners in aviation, logistics, and regional development
Interested in the JINSA Platform?

Connect with our investor relations team to discuss investment opportunities, strategic partnerships, or technical collaboration for Jakarta International Nearshore Airport.